Planning application · Onshore wind · Maldon

Middlewick wind farm

Operational20.7 MWApplication 10/00004/FULSubmitted 5 January 2010Granted on appeal 1 May 2011

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
10/00004/FUL
Planning authority
Maldon
County or area
Essex
Nation
England
Technology
Onshore wind
Capacity
20.7 MW
Status
Operational
Operator or applicant
Blue Energy (formerly Ridgewind Ltd)
Location
Land Between Middlewick Farm And Wraywick Farm, The Marshes, Southminster, Essex
Appeal reference
APP/X1545/A/10/2140423/NWF
Turbines
9
First operating
2014
  • 5 January 2010 Planning application submitted
  • 6 August 2010 Planning permission refused
  • 1 May 2011 Planning permission granted
  • 1 May 2011 Appeal granted
  • 4 June 2013 Construction started
  • 31 July 2014 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1275, Fire damages Siemens Gamesa turbine at French Farm wind farm, 102 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm102 kmSignificant
EIR-15782024Wind turbine fire near Chumleigh in Devon102 kmSignificant
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms109 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Middlewick wind farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Maldon.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.