Middlewick wind farm is a 20.7 MW wind farm 6.3 km north-east of Burnham-on-Crouch, Essex, United Kingdom. Its planning application (10/00004/FUL) went to Maldon on 5 January 2010 and was granted on appeal on 1 May 2011. It has been operating since 31 July 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

337 energy sites within 40 km for Middlewick wind farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
20.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Blue Energy (formerly Ridgewind Ltd)
Location
Land Between Middlewick Farm And Wraywick Farm, The Marshes, Southminster, Essex, Essex, United Kingdom
Planning authority
Maldon
Planning application
10/00004/FUL
Appeal reference
APP/X1545/A/10/2140423/NWF
First operating
2014
Turbines
9

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 10/00004/FUL, with what the planning evidence pack adds for this site.

Every application in Maldon · Alerts for applications and incidents near here

  • 5 January 2010 Planning application submitted
  • 6 August 2010 Planning permission refused
  • 1 May 2011 Planning permission granted
  • 1 May 2011 Appeal granted
  • 4 June 2013 Construction started
  • 31 July 2014 Operational

None found. The register holds no published incident that names Middlewick wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Middlewick wind farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Middlewick wind farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Middlewick wind farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 January 2015.
Where is Middlewick wind farm?
6.3 km north-east of Burnham-on-Crouch, Essex, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).