← Back to the applications
Full planning pack, £295Other options

Planning application · Onshore wind · Maldon

Bridgewick Farm Cottage, Bridgewick Road - Wind Turbines

Application Refused120 MWApplication 25/01022/FULMSubmitted 18 November 2025Refused 3 August 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
25/01022/FULM
Planning authority
Maldon
County or area
Essex
Nation
England
Technology
Onshore wind
Capacity
120 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Dengie Marshes Wind Farm Limited
Location
150m N/O Bridgewick Farm Cottage, Bridgewick Road, Dengie, Burnham on Crouch, CM0 7JG
Turbines
17, 200 m to tip
  • 18 November 2025 Planning application submitted
  • 3 August 2026 Planning permission refused

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0173, Substation fire breaks out at Bradwell-on-Sea Wind Farm in Essex, 6.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01732026Substation fire breaks out at Bradwell-on-Sea Wind Farm in Essex6.7 kmMinor
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm102 kmSignificant
EIR-26242018Lightning strike reportedly sets Cambridgeshire wind turbine alight102 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CM0 7JG is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Maldon.

Data updated 13 November 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.