← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · South Tyneside

Merchant House Warehouse, Tyne Dock - Solar Photovoltaics Equipment

Awaiting Construction0.7 MWApplication ST/0714/23/SPVPNSubmitted 26 September 2023Granted 17 November 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
ST/0714/23/SPVPN
Planning authority
South Tyneside
County or area
Tyne And Wear
Nation
England
Technology
Solar
Capacity
0.7 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Port Of Tyne
Location
Merchant House Warehouse, 21 Tyne Dock, West Side, South Shields, NE34 9PY
  • 26 September 2023 Planning application submitted
  • 17 November 2023 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1499, Solar panels linked to fires at council buildings in Northumberland, 15 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14992025Solar panels linked to fires at council buildings in Northumberland15 kmSignificant
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre40 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School98 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NE34 9PY is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in South Tyneside.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.