← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Tunbridge Wells

Maidstone Road, Horsmonden - Paddock Solar Farm

Under Construction49.9 MWApplication 22/02773/FULLSubmitted 20 September 2022Granted 5 September 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/02773/FULL
Planning authority
Tunbridge Wells
County or area
Kent
Nation
England
Technology
Solar
Capacity
49.9 MW
Status
Under Construction
Operator or applicant
Voltalia UK
Location
Bockingfold Farm Maidstone Road Horsmonden, TN12 8DG
  • 20 September 2022 Planning application submitted
  • 19 December 2022 Planning permission refused
  • 5 September 2023 Planning permission granted
  • 10 April 2024 Construction started
  • 19 December 2025 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1303, Solar panel inverter fault destroys two Lewes homes, 43 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13032017Solar panel inverter fault destroys two Lewes homes43 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel46 kmSignificant
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London47 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near TN12 8DG is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Tunbridge Wells.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.