Solar · United Kingdom
Hononton Farm, Furnace Lane - Solar Photovoltaics
Operator J Simpson
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 13 December 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hononton Farm, Furnace Lane - Solar Photovoltaics is a 0.2 MW solar farm 4.5 km south-east of Paddock Wood, Kent, United Kingdom. Its planning application (22/03006/PN14J) went to Tunbridge Wells on 14 October 2022 and was granted on 9 December 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hononton Farm, Furnace Lane - Solar Photovoltaics changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hononton Farm, Furnace Lane - Solar Photovoltaics sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1303, Solar panel inverter fault destroys two Lewes homes, 42 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1303 | 2017 | Solar panel inverter fault destroys two Lewes homes | 42 km | Significant |
| EIR-1305 | 2017 | Fire at Thornton Heath flats reported to have been caused by an overheated solar panel | 45 km | Significant |
| EIR-1173 | 2024 | Rooftop solar panel fire on residential block in Lewisham, London | 46 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- J Simpson
- Location
- Hononton Farm, Furnace Lane, Brenchley, Tonbridge, Kent, TN12 7BX, United Kingdom
- Planning authority
- Tunbridge Wells
- Planning application
- 22/03006/PN14J
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/03006/PN14J, with what the planning evidence pack adds for this site.
Every application in Tunbridge Wells · Alerts for applications and incidents near here
Timeline
- 14 October 2022 Planning application submitted
- 9 December 2022 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Hononton Farm, Furnace Lane - Solar Photovoltaics. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hononton Farm, Furnace Lane - Solar Photovoltaics had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hononton Farm, Furnace Lane - Solar Photovoltaics; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hononton Farm, Furnace Lane - Solar Photovoltaics?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 December 2022.
- Where is Hononton Farm, Furnace Lane - Solar Photovoltaics?
- 4.5 km south-east of Paddock Wood, Kent, United Kingdom (postcode TN12 7BX).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).