← Back to the applications
Full planning pack, £295Other options

Planning application · Solar · Tunbridge Wells

Paddock Wood Distribution Centre, Lucks Lane - Solar Panels

Application Submitted0.2 MWApplication 26/01424/FULLSubmitted 25 June 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
26/01424/FULL
Planning authority
Tunbridge Wells
County or area
Kent
Nation
England
Technology
Solar
Capacity
0.2 MW
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Redwood (Light Industrial) Propco Limited
Location
Part OS Plot 0062 Transfesa Road Paddock Wood, TN12 6UU
  • 25 June 2026 Planning application submitted

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 42 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London42 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel42 kmSignificant
EIR-15122024Solar panels involved in fire at school in Carshalton44 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near TN12 6UU is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Tunbridge Wells.

Data updated 13 November 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.