← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Battery storage · North Kesteven

Little Hale Fen - Solar Farm

Awaiting Construction50 MWApplication 23/1021/FULSubmitted 15 September 2023Granted on appeal 13 August 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/1021/FUL
Planning authority
North Kesteven
County or area
Lincolnshire
Nation
England
Technology
Battery storage (Co-located with RE)
Capacity
50 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
AGR Solar 2 Limited
Location
Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln, NG34 9LT
Appeal reference
APP/R2520/W/25/3363027
  • 15 September 2023 Planning application submitted
  • 7 November 2024 Planning permission refused
  • 7 May 2025 Appeal lodged
  • 13 August 2025 Planning permission granted
  • 13 August 2025 Appeal granted
  • 13 August 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth, caused by a short circuit in NMC cells, 61 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth, caused by a short circuit in NMC cells61 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction169 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire178 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NG34 9LT is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in North Kesteven.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.