← Back to Lincolnshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Little Hale Fen - Solar Farm

Operator AGR Solar 2 Limited · Owner Agr Solar BESS Holdco Limited

Awaiting Construction50 MWData checked 16 November 2026Source record dated 19 February 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Little Hale Fen - Solar Farm is a 50 MW battery storage site 12 km south-east of Sleaford, Lincolnshire, United Kingdom. Its planning application (23/1021/FUL) went to North Kesteven on 15 September 2023 and was granted on appeal on 13 August 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 10 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AGR SOLAR 2 LIMITED (12294992), active, since 2019. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Little Hale Fen - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 61 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells61 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction169 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire178 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
AGR Solar 2 Limited
Owner
Agr Solar BESS Holdco Limited
Location
Little Hale Fen To E/O Helpringham, Se/O Little Hale To Nw/O Bicker And Donington, Lincoln, Lincolnshire, NG34 9LT, United Kingdom
Planning authority
North Kesteven
Planning application
23/1021/FUL
Appeal reference
APP/R2520/W/25/3363027

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/1021/FUL, with what the planning evidence pack adds for this site.

Every application in North Kesteven · Alerts for applications and incidents near here

  • 15 September 2023 Planning application submitted
  • 7 November 2024 Planning permission refused
  • 7 May 2025 Appeal lodged
  • 13 August 2025 Planning permission granted
  • 13 August 2025 Appeal granted
  • 13 August 2028 Planning permission runs out

None found. The register holds no published incident that names Little Hale Fen - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Little Hale Fen - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Little Hale Fen - Solar Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Little Hale Fen - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2026.
Where is Little Hale Fen - Solar Farm?
12 km south-east of Sleaford, Lincolnshire, United Kingdom (postcode NG34 9LT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).