← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Offshore wind · Scottish Government (S36)

Levenmouth demonstration turbine (Fife Energy Park)

Operational7 MWSubmitted 2 December 2009Granted 18 November 2011

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Planning authority
Scottish Government (S36)
County or area
Offshore
Nation
Scotland
Technology
Offshore wind
Capacity
7 MW
Status
Operational
Operator or applicant
Catapult
Location
Fife Energy Park (Test Site) off the coast of Methil in Fife
Turbines
1
First operating
2014
  • 2 December 2009 Planning application submitted
  • 18 November 2011 Planning permission granted
  • 8 October 2013 Construction started
  • 31 March 2014 Operational

The pack for this site lists 11 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0758, Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm, 166 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07582024Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm166 kmSignificant
EIR-17782018Engineer loses arm during repair at North Sea Siemens Gamesa turbine166 kmMajor
EIR-04472023Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023498 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 8 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Levenmouth demonstration turbine (Fife Energy Park) is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Scottish Government (S36).

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.