Levenmouth demonstration turbine (Fife Energy Park)
Operator Catapult
Operational7 MWData checked 16 November 2026Source record dated 8 November 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Levenmouth demonstration turbine (Fife Energy Park) is a 7 MW offshore wind farm 4.8 km south-east of Methil, United Kingdom. Its planning application went to Scottish Government (S36) on 2 December 2009 and was granted on 18 November 2011. It has been operating since 31 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 11 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Levenmouth demonstration turbine (Fife Energy Park) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, offshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Offshore wind
- Capacity
- 7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Catapult
- Location
- Fife Energy Park (Test Site) off the coast of Methil in Fife, Offshore, United Kingdom
- Planning authority
- Scottish Government (S36)
- First operating
- 2014
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 2 December 2009 Planning application submitted
- 18 November 2011 Planning permission granted
- 8 October 2013 Construction started
- 31 March 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Levenmouth demonstration turbine (Fife Energy Park). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Levenmouth demonstration turbine (Fife Energy Park) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Levenmouth demonstration turbine (Fife Energy Park); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Levenmouth demonstration turbine (Fife Energy Park)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 November 2018.
- Where is Levenmouth demonstration turbine (Fife Energy Park)?
- 4.8 km south-east of Methil, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).