Land at Pen Onn - Solar Farm

Awaiting ConstructionApplication DNS/3273713Submitted 20 December 2023Granted 29 May 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DNS/3273713
Planning authority
Welsh Government (NSIP)
County or area
South Glamorgan
Nation
Wales
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Iolo Energy
Location
Land at Pen Onn, Llancarfan, Barry, CF62 3AG
  • 20 December 2023 Planning application submitted
  • 29 May 2025 Planning permission granted
  • 29 May 2030 Planning permission expired Date as recorded in the register

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 76 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter76 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire104 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool222 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CF62 3AG is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Welsh Government (NSIP).

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.