Solar · United Kingdom

Sutton Mawr Solar Farm (extension)

Operator Lightsource Renewable Energy (Rashmika SPV 1)

Abandoned8 MWData checked 16 November 2026Source record dated 1 March 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sutton Mawr Solar Farm (extension) is a 8 MW solar farm 3.7 km north-west of Barry, Vale of Glamorgan, United Kingdom. Its planning application (2016/00979/FUL) went to Vale of Glamorgan on 10 August 2016. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 39 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

424 energy sites within 40 km for Sutton Mawr Solar Farm (extension)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Lightsource Renewable Energy (Rashmika SPV 1)
Location
Land adj. to Sutton Mawr Farm, Waycock Road, BarrySouth Glamorgan, Vale of Glamorgan, CF62 3AA, United Kingdom
Planning authority
Vale of Glamorgan
Planning application
2016/00979/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2016/00979/FUL, with what the planning evidence pack adds for this site.

Every application in Vale of Glamorgan · Alerts for applications and incidents near here

  • 10 August 2016 Planning application submitted
  • 4 October 2021 Planning permission expired

None found. The register holds no published incident that names Sutton Mawr Solar Farm (extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Sutton Mawr Solar Farm (extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sutton Mawr Solar Farm (extension); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sutton Mawr Solar Farm (extension)?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 1 March 2019.
Where is Sutton Mawr Solar Farm (extension)?
3.7 km north-west of Barry, Vale of Glamorgan, United Kingdom (postcode CF62 3AA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).