Solar · United Kingdom
Cwm Derwyn Farm
Operator Kronos Solar
Operational5 MWData checked 16 November 2026Source record dated 24 March 2017
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cwm Derwyn Farm is a 5 MW solar farm on the edge of Barry, Vale of Glamorgan, United Kingdom. Its planning application (2015/00632/FUL) went to Vale of Glamorgan on 1 June 2015 and was granted on 4 September 2015. It has been operating since 17 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 39 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Cwm Derwyn Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
KRONOS SOLAR LIMITED (07241181), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Kronos Solar
- Location
- Cwm Derwyn Farm, Waycock Road, Barry, South Glamorgan, Vale of Glamorgan, CF62 3AA, United Kingdom
- Planning authority
- Vale of Glamorgan
- Planning application
- 2015/00632/FUL
- First operating
- 2017
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2015/00632/FUL, with what the planning evidence pack adds for this site.
Every application in Vale of Glamorgan · Alerts for applications and incidents near here
Timeline
- 1 June 2015 Planning application submitted
- 4 September 2015 Planning permission granted
- 15 January 2017 Construction started
- 17 March 2017 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Cwm Derwyn Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Cwm Derwyn Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cwm Derwyn Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Cwm Derwyn Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 24 March 2017.
- Where is Cwm Derwyn Farm?
- On the edge of Barry, Vale of Glamorgan, United Kingdom (postcode CF62 3AA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).