Solar · United Kingdom
East Aberthaw - Solar farm
Operator Low Carbon UK Solar Investment Co Limited · Owner Low Carbon UK Solar Holdings Limited
Awaiting Construction35 MWData checked 16 November 2026Source record dated 10 February 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
East Aberthaw - Solar farm is a 35 MW solar farm in Rhoose, South Glamorgan, United Kingdom. Its planning application (CAS-01391-M3G6Q9) went to Welsh Government (NSIP) on 6 November 2023 and was granted on 20 December 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when East Aberthaw - Solar farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
LOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED (11202297), active, since 2018. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for East Aberthaw - Solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 32 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1453 | 2026 | Fire crews tackle solar panel unit blaze in Burnham-On-Sea | 32 km | Minor |
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 54 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 54 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 35 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Low Carbon UK Solar Investment Co Limited
- Owner
- Low Carbon UK Solar Holdings Limited
- Location
- Fonmon, Barry, South Glamorgan, CF62 3BL, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- CAS-01391-M3G6Q9
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CAS-01391-M3G6Q9, with what the planning evidence pack adds for this site.
Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here
Timeline
- 6 November 2023 Planning application submitted
- 20 December 2024 Planning permission granted
- 20 December 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names East Aberthaw - Solar farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has East Aberthaw - Solar farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names East Aberthaw - Solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of East Aberthaw - Solar farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 February 2026.
- Where is East Aberthaw - Solar farm?
- In Rhoose, South Glamorgan, United Kingdom (postcode CF62 3BL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).