← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Stockton-on-Tees

Lambs Hill

Operational8 MWApplication 10/2549/EISSubmitted 7 October 2010Granted 7 December 2011

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
10/2549/EIS
Planning authority
Stockton-on-Tees
County or area
County Durham
Nation
England
Technology
Onshore wind
Capacity
8 MW
Status
Operational
Operator or applicant
Banks Renewables
Location
Stillington Industrial Estate, Stockton, village of Stillington, to the north west of Stockton and around three miles east of the A1(M
Turbines
4
First operating
2017
  • 7 October 2010 Planning application submitted
  • 7 December 2011 Planning permission granted
  • 26 February 2016 Construction started
  • 19 January 2017 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1119, Wind turbine fire at Butterwick Wind Farm near Sedgefield, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11192019Wind turbine fire at Butterwick Wind Farm near Sedgefield14 kmMinor
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate63 kmSignificant
EIR-19462022Wind turbine fire sends black smoke across Hull109 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Lambs Hill is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Stockton-on-Tees.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.