← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Scottish Government (S36)

Kennoxhead Wind Farm Extension (Phase 2)

Awaiting Construction38.4 MWApplication ECU00002038Submitted 31 March 2020Granted 10 March 2021

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
ECU00002038
Planning authority
Scottish Government (S36)
County or area
Lanarkshire
Nation
Scotland
Technology
Onshore wind
Capacity
38.4 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Orsted Onshore Limited
Location
Land north of Southern Upland hills, South Lanarkshire
Turbines
8, 180 m to tip
  • 31 March 2020 Planning application submitted
  • 10 March 2021 Planning permission granted
  • 22 September 2025 Planning permission expired

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm18 kmMajor
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow33 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm34 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Kennoxhead Wind Farm Extension (Phase 2) is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Scottish Government (S36).

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.