← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Aberdeenshire

Hill of Blairfowl Solar Farm

Planning Permission Expired1.5 MWApplication APP/2015/1819Submitted 16 June 2015Granted 7 August 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
APP/2015/1819
Planning authority
Aberdeenshire
Nation
Scotland
Technology
Solar
Capacity
1.5 MW
Status
Planning Permission Expired
Operator or applicant
Green Cat Renewables
Location
Land To The North Of St Johns, Fyvie, Turriff, Grampian, AB53 8PX
  • 16 June 2015 Planning application submitted
  • 7 August 2015 Planning permission granted
  • 7 August 2018 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 106 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14762026House fire reported to have started on solar panels in Carnoustie106 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline166 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School225 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near AB53 8PX is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Aberdeenshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.