Planning application · Onshore wind · Hartlepool

Graythorp Wind Turbine

Application Withdrawn7.5 MWApplication H/2014/0252Submitted 23 June 2014Withdrawn 30 August 2018

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
H/2014/0252
Planning authority
Hartlepool
County or area
Cleveland
Nation
England
Technology
Onshore wind
Capacity
7.5 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Seneca Global Energy
Location
Land at Graythorp Industrial Estate, Hartlepool
Appeal reference
APP/H0724/V/15/3136429
Turbines
1, 207 m to tip
  • 23 June 2014 Planning application submitted
  • 30 August 2018 Application withdrawn

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1119, Wind turbine fire at Butterwick Wind Farm near Sedgefield, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11192019Wind turbine fire at Butterwick Wind Farm near Sedgefield16 kmMinor
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate75 kmSignificant
EIR-19462022Wind turbine fire sends black smoke across Hull113 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Graythorp Wind Turbine is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Hartlepool.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.