← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Cardiff

Euroclad Group, Wentloog Road - Solar Panels

Awaiting Construction1 MWApplication 25/02982/FULSubmitted 9 January 2026Granted 6 March 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
25/02982/FUL
Planning authority
Cardiff
County or area
South Glamorgan
Nation
Wales
Technology
Solar
Capacity
1 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Euroclad Group Limited
Location
Units A, C And D Euroclad Compounds, Wentloog Corporate Industrial Park, Wentloog Road, Rumney, Cardiff, CF3 2ER
  • 9 January 2026 Planning application submitted
  • 6 March 2026 Planning permission granted
  • 6 March 2031 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea32 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels36 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol36 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CF3 2ER is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cardiff.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.