Rover Way, Splott - Energy Park & Data Centre

Operator Latos Cardiff Limited

Awaiting Construction1,000 MWData checked 16 November 2026Source record dated 20 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Rover Way, Splott - Energy Park & Data Centre is a 1,000 MW battery storage site 3.7 km east of Cardiff, South Glamorgan, United Kingdom. Its planning application (24/00624/FUL) went to Cardiff on 22 March 2024 and was granted on 15 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 64 other energy sites within 10 km, 25 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

1 heat detection within 1.5 km of this site on NASA's fire satellites, 16 Nov 2026. A detection is a heat anomaly, not a confirmed fire: a flare, a controlled burn or a neighbouring field can set it off. Members see each detection and are told the day one is made at a site they watch.

Source: NASA FIRMS (LANCE), VIIRS. Read each morning.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rover Way, Splott - Energy Park & Data Centre sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 87 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire87 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter87 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool213 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
1,000 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Latos Cardiff Limited
Location
Rover Way Splott, South Glamorgan, CF24 2RX, United Kingdom
Planning authority
Cardiff
Planning application
24/00624/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00624/FUL, with what the planning evidence pack adds for this site.

Every application in Cardiff · Alerts for applications and incidents near here

  • 22 March 2024 Planning application submitted
  • 15 April 2025 Planning permission granted
  • 15 April 2030 Planning permission runs out

None found. The register holds no published incident that names Rover Way, Splott - Energy Park & Data Centre. If you know of one, report it (confidential reports are anonymised).

Has Rover Way, Splott - Energy Park & Data Centre had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rover Way, Splott - Energy Park & Data Centre; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rover Way, Splott - Energy Park & Data Centre?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2025.
Where is Rover Way, Splott - Energy Park & Data Centre?
3.7 km east of Cardiff, South Glamorgan, United Kingdom (postcode CF24 2RX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).