Planning pack for this site, £295Other options

Solar · United Kingdom

Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar Panels

Operator Princes Limited

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 20 June 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar Panels is a 0.4 MW solar farm on the edge of Cardiff, South Glamorgan, United Kingdom. Its planning application (23/00594/CLD) went to Cardiff on 30 March 2023 and was granted on 14 June 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 67 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

1 heat detection within 1.5 km of this site on NASA's fire satellites, 16 Nov 2026. A detection is a heat anomaly, not a confirmed fire: a flare, a controlled burn or a neighbouring field can set it off. Members see each detection and are told the day one is made at a site they watch.

Source: NASA FIRMS (LANCE), VIIRS. Read each morning.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea30 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels39 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol39 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Princes Limited
Location
Unit 68-69, Portmanmoor Road Industrial Estate, Portmanmoor Road, Splott, Cardiff, South Glamorgan, CF24 5PS, United Kingdom
Planning authority
Cardiff
Planning application
23/00594/CLD

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00594/CLD, with what the planning evidence pack adds for this site.

Every application in Cardiff · Alerts for applications and incidents near here

  • 30 March 2023 Planning application submitted
  • 14 June 2023 Planning permission granted

None found. The register holds no published incident that names Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 20 June 2023.
Where is Portmanmoor Road Industrial Estate, Portmanmoor Road - Solar Panels?
On the edge of Cardiff, South Glamorgan, United Kingdom (postcode CF24 5PS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).