Planning application · Solar · Bournemouth, Christchurch and Poole

Dorset Green Solar Farm

Operational5 MWApplication APP/21/00400/FSubmitted 12 March 2021Granted 23 July 2021

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
APP/21/00400/F
Planning authority
Bournemouth, Christchurch and Poole
County or area
Dorset
Nation
England
Technology
Solar
Capacity
5 MW
Status
Operational
Operator or applicant
Canford Renewable Energy Limited
Location
Canford Renewable Energy, Canford Recycling Centre, Arena Way, Wimborne, BH21 3BW
First operating
2023
  • 12 March 2021 Planning application submitted
  • 23 July 2021 Planning permission granted
  • 28 May 2022 Construction started
  • 5 April 2023 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1396, Solar panel fire leads to Travelodge evacuation in Poole, 3.4 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13962024Solar panel fire leads to Travelodge evacuation in Poole3.4 kmMinor
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown5.5 kmSignificant
EIR-15162025Solar panels suspected in house roof fire in Ferndown5.6 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BH21 3BW is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Bournemouth, Christchurch and Poole.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.