← Back to Dorset

Battery storage · United Kingdom

Dorset Green Battery

Operator Canford Renewable Energy Limited

OperationalData checked 16 November 2026Source record dated 19 July 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Dorset Green Battery is a battery storage site on the edge of Wimborne Minster, Dorset, United Kingdom. Its planning application (APP/21/00400/F) went to Bournemouth, Christchurch and Poole on 12 March 2021 and was granted on 27 July 2021. It has been operating since 5 April 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 48 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 2 other sites and 215 energy sites within 40 km for Dorset Green Battery

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Co-located with RE)
Status
Operational
Operator or applicant
Canford Renewable Energy Limited
Location
Canford Renewable Energy, Canford Recycling Centre, Arena Way, Wimborne, Dorset, BH21 3BW, United Kingdom
Planning authority
Bournemouth, Christchurch and Poole
Planning application
APP/21/00400/F
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/21/00400/F, with what the planning evidence pack adds for this site.

Every application in Bournemouth, Christchurch and Poole · Alerts for applications and incidents near here

  • 12 March 2021 Planning application submitted
  • 27 July 2021 Planning permission granted
  • 28 May 2022 Construction started
  • 5 April 2023 Operational

None found. The register holds no published incident that names Dorset Green Battery. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Dorset Green Battery had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dorset Green Battery; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dorset Green Battery?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 19 July 2022.
Where is Dorset Green Battery?
On the edge of Wimborne Minster, Dorset, United Kingdom (postcode BH21 3BW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).