Battery storage · United Kingdom
Dorset Green Battery
Operator Canford Renewable Energy Limited
OperationalData checked 16 November 2026Source record dated 19 July 2022
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Dorset Green Battery is a battery storage site on the edge of Wimborne Minster, Dorset, United Kingdom. Its planning application (APP/21/00400/F) went to Bournemouth, Christchurch and Poole on 12 March 2021 and was granted on 27 July 2021. It has been operating since 5 April 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 48 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Dorset Green Battery changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Co-located with RE)
- Status
- Operational
- Operator or applicant
- Canford Renewable Energy Limited
- Location
- Canford Renewable Energy, Canford Recycling Centre, Arena Way, Wimborne, Dorset, BH21 3BW, United Kingdom
- Planning authority
- Bournemouth, Christchurch and Poole
- Planning application
- APP/21/00400/F
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/21/00400/F, with what the planning evidence pack adds for this site.
Every application in Bournemouth, Christchurch and Poole · Alerts for applications and incidents near here
Timeline
- 12 March 2021 Planning application submitted
- 27 July 2021 Planning permission granted
- 28 May 2022 Construction started
- 5 April 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Dorset Green Battery. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Dorset Green Battery had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Dorset Green Battery; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Dorset Green Battery?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 19 July 2022.
- Where is Dorset Green Battery?
- On the edge of Wimborne Minster, Dorset, United Kingdom (postcode BH21 3BW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).