Solar · United Kingdom
Fleets Corner Business Park - Unit A3 - Solar Panels
Operator Britel Fund Trustees Limited
Application SubmittedData checked 16 November 2026Source record dated 2 September 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Fleets Corner Business Park - Unit A3 - Solar Panels is a solar farm on the edge of Broadstone, Dorset, United Kingdom. Its planning application (P/26/03619/PNPHV) went to Bournemouth, Christchurch and Poole on 11 August 2026. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 41 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Fleets Corner Business Park - Unit A3 - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fleets Corner Business Park - Unit A3 - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1396, Solar panel fire leads to Travelodge evacuation in Poole, 2.2 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1396 | 2024 | Solar panel fire leads to Travelodge evacuation in Poole | 2.2 km | Minor |
| EIR-1516 | 2025 | Solar panels suspected in house roof fire in Ferndown | 9.4 km | Significant |
| EIR-1532 | 2023 | Roof-space fire involving a solar inverter at a house in Ferndown | 9.4 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Britel Fund Trustees Limited
- Location
- Unit A3 Fleets Corner Business Park, Dorset, BH17 0LA, United Kingdom
- Planning authority
- Bournemouth, Christchurch and Poole
- Planning application
- P/26/03619/PNPHV
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/26/03619/PNPHV, with what the planning evidence pack adds for this site.
Every application in Bournemouth, Christchurch and Poole · Alerts for applications and incidents near here
Timeline
- 11 August 2026 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Fleets Corner Business Park - Unit A3 - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Fleets Corner Business Park - Unit A3 - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Fleets Corner Business Park - Unit A3 - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Fleets Corner Business Park - Unit A3 - Solar Panels?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2026.
- Where is Fleets Corner Business Park - Unit A3 - Solar Panels?
- On the edge of Broadstone, Dorset, United Kingdom (postcode BH17 0LA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).