← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Scottish Government (S36)

Craiginmoddie Wind Farm

Awaiting Construction92.4 MWApplication ECU00002196Submitted 21 January 2021Granted 5 November 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
ECU00002196
Planning authority
Scottish Government (S36)
County or area
Ayrshire
Nation
Scotland
Technology
Onshore wind
Capacity
92.4 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Energiekontor (UK) Limited
Location
Craiginmoddie U27 From B741 Junction At Cloyntie To U66 Junction At South Balloch Maybole South Ayrshire, KA19
Turbines
14, 200 m to tip
  • 21 January 2021 Planning application submitted
  • 5 November 2025 Planning permission granted
  • 5 November 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0922, Vestas turbine nacelle fire at Ardrossan wind farm during storm, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm20 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire29 kmSignificant
EIR-10252018Worker dies after becoming stranded at Afton wind farm32 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near KA19 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Scottish Government (S36).

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.