Battery storage · United Kingdom

Craiginmoddie Wind Farm

Operator Energiekontor (UK) Limited · Owner Energiekontor AG

Awaiting ConstructionData checked 16 November 2026Source record dated 2 December 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Craiginmoddie Wind Farm is a battery storage site 12 km south of Ayr, United Kingdom. Its planning application (ECU00002196) went to Scottish Government (S36) on 21 January 2021 and was granted on 5 November 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 7 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ENERGIEKONTOR UK LTD (03830819), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Craiginmoddie Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 246 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool246 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells340 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire444 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Energiekontor (UK) Limited
Owner
Energiekontor AG
Location
Craiginmoddie U27 From B741 Junction At Cloyntie To U66 Junction At South Balloch Maybole South Ayrshire, Ayrshire, KA19, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00002196

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00002196, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 21 January 2021 Planning application submitted
  • 5 November 2025 Planning permission granted
  • 5 November 2028 Planning permission runs out

None found. The register holds no published incident that names Craiginmoddie Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Craiginmoddie Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Craiginmoddie Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Craiginmoddie Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
Where is Craiginmoddie Wind Farm?
12 km south of Ayr, United Kingdom (postcode KA19).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).