Planning application · Solar · Bath and North East Somerset

Chelwood Solar Farm

Operational5 MWApplication 14/01895/FULSubmitted 19 May 2014Granted 12 September 2014

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
14/01895/FUL
Planning authority
Bath and North East Somerset
County or area
Somerset
Nation
England
Technology
Solar
Capacity
5 MW
Status
Operational
Operator or applicant
Mongoose Energy Coop
Location
Parcel 1326, Church Farm, Main Road, Chelwood, Bristol, BS39 4NR
First operating
2015
  • 19 May 2014 Planning application submitted
  • 12 September 2014 Planning permission granted
  • 1 October 2015 Construction started
  • 10 December 2015 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2065, Loft fire believed caused by a solar panel at Paintworks flats in Bristol, 11 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol11 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels11 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol11 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BS39 4NR is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Bath and North East Somerset.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.