Solar · United Kingdom
Chelwood Solar Farm
Operator Mongoose Energy Coop
Operational5 MWData checked 16 November 2026Source record dated 20 July 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Chelwood Solar Farm is a 5 MW solar farm 7.3 km north-west of Peasedown Saint John, Somerset, United Kingdom. Its planning application (14/01895/FUL) went to Bath and North East Somerset on 19 May 2014 and was granted on 12 September 2014. It has been operating since 10 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Chelwood Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Mongoose Energy Coop
- Location
- Parcel 1326, Church Farm, Main Road, Chelwood, Bristol, Somerset, BS39 4NR, United Kingdom
- Planning authority
- Bath and North East Somerset
- Planning application
- 14/01895/FUL
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/01895/FUL, with what the planning evidence pack adds for this site.
Every application in Bath and North East Somerset · Alerts for applications and incidents near here
Timeline
- 19 May 2014 Planning application submitted
- 12 September 2014 Planning permission granted
- 1 October 2015 Construction started
- 10 December 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Chelwood Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Chelwood Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Chelwood Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Chelwood Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 July 2016.
- Where is Chelwood Solar Farm?
- 7.3 km north-west of Peasedown Saint John, Somerset, United Kingdom (postcode BS39 4NR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).