Fairy Hill, Compton Dando - Solar Farm
Operator Environmental Gain Limited & Bath & West Community Energy Limited
Awaiting Construction2.1 MWData checked 16 November 2026Source record dated 2 December 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Fairy Hill, Compton Dando - Solar Farm is a 2.1 MW solar farm 3.6 km south of Keynsham, Somerset, United Kingdom. Its planning application (23/04529/FUL) went to Bath and North East Somerset on 4 December 2023 and was granted on 29 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Fairy Hill, Compton Dando - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fairy Hill, Compton Dando - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2065, Loft fire believed caused by a solar panel at Paintworks flats in Bristol, 7.7 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2065 | 2021 | Loft fire believed caused by a solar panel at Paintworks flats in Bristol | 7.7 km | Minor |
| EIR-1416 | 2025 | Fire at Bristol hospital started in solar panels | 8.5 km | Significant |
| EIR-1274 | 2022 | Fire damages rooftop solar panels at We The Curious in Bristol | 8.5 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 2.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Environmental Gain Limited & Bath & West Community Energy Limited
- Location
- Parcel 6600, Fairy Hill, Compton Dando, Somerset, BS39 4LJ, United Kingdom
- Planning authority
- Bath and North East Somerset
- Planning application
- 23/04529/FUL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/04529/FUL, with what the planning evidence pack adds for this site.
Every application in Bath and North East Somerset · Alerts for applications and incidents near here
Timeline
- 4 December 2023 Planning application submitted
- 29 July 2025 Planning permission granted
- 29 July 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Fairy Hill, Compton Dando - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Fairy Hill, Compton Dando - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Fairy Hill, Compton Dando - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Fairy Hill, Compton Dando - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
- Where is Fairy Hill, Compton Dando - Solar Farm?
- 3.6 km south of Keynsham, Somerset, United Kingdom (postcode BS39 4LJ).