Planning application · Solar · Harlow

Calder House, Central Road - Solar Panels

Awaiting Construction0.4 MWApplication HW/PASP/22/00426Submitted 21 October 2022Granted 13 December 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
HW/PASP/22/00426
Planning authority
Harlow
County or area
Essex
Nation
England
Technology
Solar
Capacity
0.4 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Nuveen Real Estate
Location
Calder House Central Road, CM20 2ST
  • 21 October 2022 Planning application submitted
  • 13 December 2022 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1514, Garage fire destroys solar panels in Southgate, with a battery storage fault suspected, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected24 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house34 kmMinor
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CM20 2ST is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Harlow.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.