← Back to Essex
Planning pack for this site, £295Other options

Solar · United Kingdom

Harlow Leisurezone, Second Avenue - Solar panels

Operator Harlow Leisurezone

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 3 May 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Harlow Leisurezone, Second Avenue - Solar panels is a 0.7 MW solar farm in Harlow, Essex, United Kingdom. Its planning application (HW/PASP/24/00087) went to Harlow on 19 March 2024 and was granted on 30 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Harlow Leisurezone, Second Avenue - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1514, Garage fire destroys solar panels in Southgate, with a battery storage fault suspected, 22 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected22 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house34 kmMinor
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London35 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Harlow Leisurezone
Location
Harlow Leisurezone, Second Avenue, Harlow, Essex, CM20 3DT, United Kingdom
Planning authority
Harlow
Planning application
HW/PASP/24/00087

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for HW/PASP/24/00087, with what the planning evidence pack adds for this site.

Every application in Harlow · Alerts for applications and incidents near here

  • 30 April 2019 Planning permission expired
  • 19 March 2024 Planning application submitted
  • 30 April 2024 Planning permission granted

None found. The register holds no published incident that names Harlow Leisurezone, Second Avenue - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Harlow Leisurezone, Second Avenue - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Harlow Leisurezone, Second Avenue - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Harlow Leisurezone, Second Avenue - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2024.
Where is Harlow Leisurezone, Second Avenue - Solar panels?
In Harlow, Essex, United Kingdom (postcode CM20 3DT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).