Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels

Operator FRELIF (Harlow)

Application Refused0.6 MWData checked 16 November 2026Source record dated 20 September 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels is a 0.6 MW solar farm 3.2 km south-west of Harlow, Essex, United Kingdom. Its planning application (HW/PASP/23/00302) went to Harlow on 21 July 2023 and was refused on 8 September 2023. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 27 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 802 energy sites within 40 km for Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
FRELIF (Harlow)
Location
GSK Icon Harlow Third Avenue Harlow, Essex, CM19 5AW, United Kingdom
Planning authority
Harlow
Planning application
HW/PASP/23/00302

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for HW/PASP/23/00302, with what the planning evidence pack adds for this site.

Every application in Harlow · Alerts for applications and incidents near here

  • 21 July 2023 Planning application submitted
  • 8 September 2023 Planning permission refused

None found. The register holds no published incident that names Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 20 September 2023.
Where is Icon Harlow, Gsk Third Avenue - Solar Photovoltaic Panels?
3.2 km south-west of Harlow, Essex, United Kingdom (postcode CM19 5AW).