Solar · United Kingdom

Gsk Icon Harlow - Solar Photovoltaic Panels

Operator FRELIF (Harlow)

Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 10 November 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gsk Icon Harlow - Solar Photovoltaic Panels is a 0.6 MW solar farm 3.4 km south-west of Harlow, Essex, United Kingdom. Its planning application (HW/PASP/23/00396) went to Harlow on 29 September 2023 and was granted on 7 November 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gsk Icon Harlow - Solar Photovoltaic Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1514, Garage fire destroys solar panels in Southgate, with a battery storage fault suspected, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected20 kmMinor
EIR-11702025Rooftop solar panels catch fire at IKEA store in Wembley33 kmSignificant
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London34 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
FRELIF (Harlow)
Location
Third Avenue, Harlow, Essex, CM19 5AW, United Kingdom
Planning authority
Harlow
Planning application
HW/PASP/23/00396

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for HW/PASP/23/00396, with what the planning evidence pack adds for this site.

Every application in Harlow · Alerts for applications and incidents near here

  • 29 September 2023 Planning application submitted
  • 7 November 2023 Planning permission granted

None found. The register holds no published incident that names Gsk Icon Harlow - Solar Photovoltaic Panels. If you know of one, report it (confidential reports are anonymised).

Has Gsk Icon Harlow - Solar Photovoltaic Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gsk Icon Harlow - Solar Photovoltaic Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gsk Icon Harlow - Solar Photovoltaic Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 November 2023.
Where is Gsk Icon Harlow - Solar Photovoltaic Panels?
3.4 km south-west of Harlow, Essex, United Kingdom (postcode CM19 5AW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).