← Back to Essex
Planning pack for this site, £295Other options

Solar · United Kingdom

Edinburgh Way - Solar Panels

Operator Indurent Propco A1 Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 1 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Edinburgh Way - Solar Panels is a 0.2 MW solar farm in Old Harlow, Essex, United Kingdom. Its planning application (HW/PASP/26/00002) went to Harlow on 22 January 2026 and was granted on 19 March 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 31 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Edinburgh Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1514, Garage fire destroys solar panels in Southgate, with a battery storage fault suspected, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected25 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house34 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers37 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Indurent Propco A1 Limited
Location
Cartel Business Park, Edinburgh Way, Harlow, Essex, CM20 2TT, United Kingdom
Planning authority
Harlow
Planning application
HW/PASP/26/00002

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for HW/PASP/26/00002, with what the planning evidence pack adds for this site.

Every application in Harlow · Alerts for applications and incidents near here

  • 22 January 2026 Planning application submitted
  • 19 March 2026 Planning permission granted

None found. The register holds no published incident that names Edinburgh Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Edinburgh Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Edinburgh Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Edinburgh Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 May 2026.
Where is Edinburgh Way - Solar Panels?
In Old Harlow, Essex, United Kingdom (postcode CM20 2TT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).