Bretton Hall Solar Farm (Wales)

Awaiting Construction16 MWApplication DNS/3251545Submitted 8 July 2022Granted 19 December 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DNS/3251545
Planning authority
Welsh Government (NSIP)
County or area
Clwyd
Nation
Wales
Technology
Solar
Capacity
16 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
YnNi Newydd (New Energy Co-op)
Location
Bretton Hall Farm, Chester Road, Flintshire, CH4 0DF
  • 8 July 2022 Planning application submitted
  • 19 December 2023 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1553, Roof fire involving 14 solar panels attended in Shropshire, 43 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire43 kmMinor
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school46 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent54 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CH4 0DF is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Welsh Government (NSIP).

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.