← Back to Clwyd
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Bretton Hall Solar Farm (Wales)

Operator YnNi Newydd (New Energy Co-op)

Awaiting ConstructionData checked 16 November 2026Source record dated 15 July 2022

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bretton Hall Solar Farm (Wales) is a battery storage site on the edge of Broughton, Clwyd, United Kingdom. Its planning application (DNS/3251545) went to Welsh Government (NSIP) on 8 July 2022 and was granted on 19 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 9 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bretton Hall Solar Farm (Wales) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool25 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells123 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire176 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
YnNi Newydd (New Energy Co-op)
Location
Bretton Hall Farm, Chester Road, Flintshire, Clwyd, CH4 0DF, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
DNS/3251545

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DNS/3251545, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 8 July 2022 Planning application submitted
  • 19 December 2023 Planning permission granted
  • 19 December 2024 Planning permission expired

None found. The register holds no published incident that names Bretton Hall Solar Farm (Wales). If you know of one, report it (confidential reports are anonymised).

Has Bretton Hall Solar Farm (Wales) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bretton Hall Solar Farm (Wales); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bretton Hall Solar Farm (Wales)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 July 2022.
Where is Bretton Hall Solar Farm (Wales)?
On the edge of Broughton, Clwyd, United Kingdom (postcode CH4 0DF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).