Solar · United Kingdom
Bretton Hall Solar Farm (Wales)
Operator YnNi Newydd (New Energy Co-op)
Awaiting Construction16 MWData checked 16 November 2026Source record dated 10 January 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bretton Hall Solar Farm (Wales) is a 16 MW solar farm on the edge of Broughton, Clwyd, United Kingdom. Its planning application (DNS/3251545) went to Welsh Government (NSIP) on 8 July 2022 and was granted on 19 December 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bretton Hall Solar Farm (Wales) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bretton Hall Solar Farm (Wales) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1553, Roof fire involving 14 solar panels attended in Shropshire, 43 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1553 | 2017 | Roof fire involving 14 solar panels attended in Shropshire | 43 km | Minor |
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 46 km | Significant |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 54 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 16 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- YnNi Newydd (New Energy Co-op)
- Location
- Bretton Hall Farm, Chester Road, Flintshire, Clwyd, CH4 0DF, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- DNS/3251545
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DNS/3251545, with what the planning evidence pack adds for this site.
Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here
Timeline
- 8 July 2022 Planning application submitted
- 19 December 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Bretton Hall Solar Farm (Wales). If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bretton Hall Solar Farm (Wales) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bretton Hall Solar Farm (Wales); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bretton Hall Solar Farm (Wales)?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 January 2024.
- Where is Bretton Hall Solar Farm (Wales)?
- On the edge of Broughton, Clwyd, United Kingdom (postcode CH4 0DF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).