Bretton Hall Solar Farm (England)

Operator YnNi Newydd (New Energy Co-op)

Awaiting Construction14 MWData checked 16 November 2026Source record dated 12 October 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bretton Hall Solar Farm (England) is a 14 MW solar farm on the edge of Broughton, Clwyd, United Kingdom. Its planning application (22/02042/FUL) went to Flintshire on 31 May 2022 and was granted on 12 October 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 44 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bretton Hall Solar Farm (England) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1553, Roof fire involving 14 solar panels attended in Shropshire, 42 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire42 kmMinor
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school46 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent53 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
14 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
YnNi Newydd (New Energy Co-op)
Location
Bretton Hall Farm, Chester Road, Bretton, Chester, Clwyd, CH4 0DF, United Kingdom
Planning authority
Flintshire
Planning application
22/02042/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/02042/FUL, with what the planning evidence pack adds for this site.

Every application in Flintshire · Alerts for applications and incidents near here

  • 31 May 2022 Planning application submitted
  • 12 October 2023 Planning permission granted
  • 12 October 2028 Planning permission runs out

None found. The register holds no published incident that names Bretton Hall Solar Farm (England). If you know of one, report it (confidential reports are anonymised).

Has Bretton Hall Solar Farm (England) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bretton Hall Solar Farm (England); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bretton Hall Solar Farm (England)?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 October 2023.
Where is Bretton Hall Solar Farm (England)?
On the edge of Broughton, Clwyd, United Kingdom (postcode CH4 0DF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).