Planning application · Solar · East Cambridgeshire

Breach Farm - Solar farm

Operational67 MWApplication DC/21/0968/FULSubmitted 29 April 2021Granted 10 December 2021

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DC/21/0968/FUL
Planning authority
East Cambridgeshire
County or area
Cambridgeshire
Nation
England
Technology
Solar
Capacity
67 MW
Status
Operational
Operator or applicant
Octopus Renewables Infrastructure Trust
Location
Land South Of Breach Farm Ness Road Burwell Cambridge, CB25 0DB
First operating
2023
  • 29 April 2021 Planning application submitted
  • 10 December 2021 Planning permission granted
  • 1 December 2023 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium18 kmMinor
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof51 kmSignificant
EIR-14932026Solar panels catch fire on Bedford warehouse roof54 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CB25 0DB is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Cambridgeshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.