Planning application · Solar · Cheshire East

Bentley Motors

Operational2.9 MWApplication 16/4268NSubmitted 31 August 2016Granted 24 November 2016

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
16/4268N
Planning authority
Cheshire East
County or area
Cheshire
Nation
England
Technology
Solar
Capacity
2.9 MW
Status
Operational
Operator or applicant
Bentley Motors
Location
Bentley Motors Ltd, Pyms Lane, Crewe, CW1 3PL
First operating
2018
  • 31 August 2016 Planning application submitted
  • 24 November 2016 Planning permission granted
  • 21 March 2018 Construction started
  • 1 August 2018 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1485, Faulty solar panel wiring sparks house fire in Stoke-on-Trent, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent21 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire22 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall23 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CW1 3PL is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cheshire East.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.