← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Scottish Government (S36)

Benbrack Wind Farm

Operational67.1 MWApplication EC00002082Submitted 20 November 2014Granted on appeal 15 September 2017

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
EC00002082
Planning authority
Scottish Government (S36)
County or area
East Ayrshire
Nation
Scotland
Technology
Onshore wind
Capacity
67.1 MW
Status
Operational
Operator or applicant
E.ON Renewables / Red Rock Power Limited
Location
Near Carsphairn and Dalmellington
Appeal reference
WIN-170-2002
Turbines
15, 149.9 m to tip
First operating
2025
  • 20 November 2014 Planning application submitted
  • 19 November 2015 Appeal lodged
  • 15 September 2017 Planning permission granted
  • 15 September 2017 Appeal granted
  • 1 August 2022 Construction started
  • 1 October 2025 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1025, Worker dies after becoming stranded at Afton wind farm, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10252018Worker dies after becoming stranded at Afton wind farm26 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm28 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire35 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Benbrack Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Scottish Government (S36).

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.