← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Kingston upon Hull, City of

Andrew Johnson Knudtzon Limited, Boulevard - Solar panels

Awaiting Construction0.7 MWApplication 23/03485/PAAPSubmitted 6 December 2023Granted 1 February 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/03485/PAAP
Planning authority
Kingston upon Hull, City of
County or area
East Riding of Yorkshire
Nation
England
Technology
Solar
Capacity
0.7 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AJK Coldstores
Location
E/O Boulevard, Site A , Andrew Johnson Knudtzon Limited, Boulevard, Kingston Upon Hull, HU3 4DY
  • 1 February 2010 Planning permission expired
  • 6 December 2023 Planning application submitted
  • 1 February 2024 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 50 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster50 kmSignificant
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton53 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine85 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near HU3 4DY is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Kingston upon Hull, City of.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.