Solar · United Kingdom
Samaritans Spring Bank Solar Panels
Operator Samaritans of Kingston upon Hull
OperationalData checked 16 November 2026Source record dated 15 February 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Samaritans Spring Bank Solar Panels is a solar farm in Kingston upon Hull, East Riding of Yorkshire, United Kingdom. Its planning application (20/01489/FULL) went to Kingston upon Hull, City of on 7 December 2020 and was granted on 2 March 2021. It has been operating since 1 July 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 81 other energy sites within 10 km, 42 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Samaritans Spring Bank Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Status
- Operational
- Operator or applicant
- Samaritans of Kingston upon Hull
- Location
- Samaritans, 75 Spring Bank, Kingston Upon Hull, East Riding of Yorkshire, HU3 1AG, United Kingdom
- Planning authority
- Kingston upon Hull, City of
- Planning application
- 20/01489/FULL
- First operating
- 2021
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/01489/FULL, with what the planning evidence pack adds for this site.
Every application in Kingston upon Hull, City of · Alerts for applications and incidents near here
Timeline
- 7 December 2020 Planning application submitted
- 2 March 2021 Planning permission granted
- 1 July 2021 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Samaritans Spring Bank Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Samaritans Spring Bank Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Samaritans Spring Bank Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Samaritans Spring Bank Solar Panels?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 February 2024.
- Where is Samaritans Spring Bank Solar Panels?
- In Kingston upon Hull, East Riding of Yorkshire, United Kingdom (postcode HU3 1AG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).