← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · West Dunbartonshire

Aggreko, Stirling Road - Solar Panels

Application Submitted8.8 MWApplication DC22/168/FULSubmitted 29 August 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DC22/168/FUL
Planning authority
West Dunbartonshire
County or area
Strathclyde
Nation
Scotland
Technology
Solar
Capacity
8.8 MW
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Aggreko
Location
Aggreko Ltd Stirling Road, G82 3RG
  • 29 August 2022 Planning application submitted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 70 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline70 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School126 kmSignificant
EIR-14762026House fire reported to have started on solar panels in Carnoustie129 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near G82 3RG is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in West Dunbartonshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.