Fallen trees and failed backup switch cause University of Virginia data centre outage

Apr 2023Published 12 Oct 2026Responsible editor: Chief Editor

Estimated damageModelled by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersLow confidence
out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden

Companies named in this entry: University of Virginia

On the late evening of Sunday 30 April 2023, fallen trees affected the grid connection supplying the on-site data centre at the University of Virginia in Charlottesville. The facility was designed to move automatically to a backup generator, but the backup switch failed and the data centre went down. Power was restored from 11:30am on Monday 1 May 2023 after university staff manually transferred power to the data centre. The outage affected Wi-Fi services and disabled access to applications that require NetBadge authentication, including Workday, Collab, the Student Information System and UVABox. The account is based on a report by Data Centre Dynamics, which cites the university publication UVAToday.

Fallen trees affected the grid connection to the on-site data centre. The automatic transfer to backup generator power did not operate as intended because the backup switch failed. Restoration depended on manual transfer of power by university staff.

  1. Test automatic transfer switches under load at regular intervals, since a switch that has not been exercised may fail when a real grid loss occurs.
  2. Confirm that manual transfer procedures to backup generation are documented, rehearsed and can be carried out quickly by on-call staff.
  3. Map which IT services depend on the on-site facility and plan communications and alternative access for users during a prolonged outage.
  4. Assess the risk from vegetation near overhead supply lines to critical power connections and include it in maintenance plans.

More lessons on worker safety and safe systems of work, outages, backup supply and restoration, electrical protection and isolation, from every incident on the register.

Published 2026-10-12. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Data centre incidents in the United States, by year, free with a credit (PNG).

Data centre incidents in the United States: 50 entries, with a free alert for the next one.

Browse the full register or submit an incident.