Current transformer explosion at Jebba substation disturbs Nigeria's national grid
Oct 2024Published 1 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in Nigeria, and an email when EIR-1722 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Transmission Company of Nigeria
What happened
On 19 October 2024 at 08:15, the bus section of a current transformer exploded at the 330 kV Jebba Transmission Substation. The Transmission Company of Nigeria said protection opened the busbars, preventing fire and further damage to adjacent equipment, and described the result as a temporary grid disturbance. National supply fell from 3,041.72 MW at 08:00 to 47 MW by 09:00, with seven of 11 distribution companies reported to have zero load allocation.
The regulator said the explosion triggered a cascade of power plant shutdowns and that supply had been significantly restored in 33 states and the Federal Capital Territory by 13:00. A separate report of vandalism on the Shiroro-Kaduna lines was also published; it was not identified as the cause of this explosion.
Contributing factors
The reported trigger was the explosion of a current transformer. The cause of that explosion was not stated. Protection isolated the fault but also disturbed the grid and was followed by a cascade of plant shutdowns.
Lessons learned
- Protection that isolates a failed current transformer can prevent fire, but the same trip can disturb a tightly coupled grid.
- After a busbar trip, operators need a rehearsed way to reconfigure and restore supply without waiting for the failed unit to return.
- A single substation fault can cascade into widespread loss of load, so contingency arrangements should limit how far one trip takes generation offline.
More lessons on electrical protection and isolation, outages, backup supply and restoration, from every incident on the register.
Source
Published 2026-10-01. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.