← Back to the list

Register / Wind (onshore) / EIR-1664
Wind (onshore)CanadaEIR-1664

Turbine tower collapses at Halkirk 2 wind project during commissioning

Nov 2024Published 30 Sept 2026

Tower 33 at the Halkirk 2 wind project near Castor, Alberta, fell to the ground on 8 November 2024. The recently constructed field was being brought online and was introducing power to Alberta's grid. The incident caused a complete loss of the tower and a suspension order for the entire field. Capital Power later said site cleanup was complete, with components cut into transportable sections or dismantled and taken away for recycling or disposal. Commissioning resumed in the week of 24 November 2025, and by 25 November the project was again supplying power to the grid.

An investigation by the turbine manufacturer, who is not named, and an independent third party found that contactors used out-of-tolerance tooling to tension the tower-to-nacelle structural bolts.

  1. Check that tools used to tension structural bolts are within tolerance before tower and nacelle assembly.
  2. After a structural failure during commissioning, complete both a manufacturer review and an independent review before returning the site to service.
  3. Plan how large turbine components will be cut, moved, recycled or disposed of after a collapse.

Published 2026-09-30. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

Get the next one like this

One email when a newly reported incident is confirmed, at most two a day, plus a Monday digest. Free, no account needed, unsubscribe in one click.

By subscribing you agree to the privacy policy.

Related incidents

Wind (onshore) incidents in Canada: 27 entries, with a free alert for the next one.

Browse the full register or submit an incident.