Explosion at Tom nan Clach wind farm south of Nairn injures worker
June 2020Published 30 Sept 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on wind (onshore) incidents in the United Kingdom, and an email when EIR-1663 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Natural Power Services
What happened
A subcontractor working on the Tom nan Clach wind farm south of Nairn was injured when a power cabinet controlling 33,000 volts exploded. The worker had been carrying out maintenance on one of two cabinets at the site. An initial isolation switching programme had been changed twice, leading to confusion over which cabinet had been isolated. Power was restored to the wrong cabinet while work continued. A flashover occurred, engulfing the worker in flames. Colleagues used fire extinguishers and cold water until emergency services arrived. The worker was airlifted to a specialist burns unit and required multiple surgeries. Natural Power Services admitted health and safety breaches and was fined.
Contributing factors
The original isolation switching programme was not followed. Changes to the programme caused confusion over which cabinet was isolated. The cabinets were poorly labelled. Checks that the correct cabinets had been isolated were inadequate.
Lessons learned
- Ensure isolation switching programmes are followed exactly and any changes are clearly communicated and documented.
- Label all high-voltage cabinets clearly and unambiguously before maintenance begins.
- Verify isolation of the correct equipment before work proceeds and before power is restored.
More lessons on electrical protection and isolation, maintenance, inspection and ageing assets, from every incident on the register.
Source
Site page: Tom Nan Clach (status, dates and other incidents)
Published 2026-09-30. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.