Tom Na Clach - Wind Farm Extension

Operator Infinergy Limited

Awaiting Construction31.5 MWData checked 16 November 2026Source record dated 10 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Tom Na Clach - Wind Farm Extension is a 31.5 MW wind farm 18 km south-east of Westhill, Nairn, United Kingdom. Its planning application (ECU00003453) went to Scottish Government (S36) on 6 April 2022 and was granted on 10 May 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tom Na Clach - Wind Farm Extension sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 68 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm68 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK68 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment68 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
31.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Infinergy Limited
Location
Tom Nan Clach Wind Farm, Glenferness, Nairn, IV12, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00003453
Turbines
7, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00003453, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 6 April 2022 Planning application submitted
  • 10 May 2024 Planning permission granted
  • 10 May 2029 Planning permission runs out

None found. The register holds no published incident that names Tom Na Clach - Wind Farm Extension. If you know of one, report it (confidential reports are anonymised).

Has Tom Na Clach - Wind Farm Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Tom Na Clach - Wind Farm Extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Tom Na Clach - Wind Farm Extension?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 July 2024.
Where is Tom Na Clach - Wind Farm Extension?
18 km south-east of Westhill, Nairn, United Kingdom (postcode IV12).